The months after signing are not a delay. They are the product.
Approved, signed, and then nothing visible for a season. The customer did not change their mind — they were never told what month three was supposed to look like.
The meeting went well. The numbers worked, the roof works, the signature is on the page. Then comes the part nobody rehearses: an interconnection application, a utility review, an agreement, a permit, a build, an inspection, a pile of as-built paperwork, and finally permission to operate. Months. From the customer’s desk, most of it looks like nothing happening at all.
At week ten they call, and they are not asking a question. They are checking whether they were sold something that is not real.
Which step broke
In the Court Method every lost meeting died at one of six steps — open, roadmap, problem, solution, benefits, paperwork. This is the roadmap step, and commercial solar punishes a missing roadmap harder than any other row in the manual, because the gap between *yes* and *on* is measured in seasons rather than days.
The roadmap step is where you say what happens in this meeting **and after it**, before any of it happens. Say it and month three is step four of eight. Leave it out and the customer fills the silence themselves, and what they fill it with is doubt about you.
The sequence, and the part that makes it hard
Every commercial project passes through roughly the same gates: the interconnection application goes to the utility; the utility reviews it and may require further study of what the system does to their network; an interconnection agreement is signed; the permit goes to the authority having jurisdiction; the system gets built; it gets inspected; as-built documentation goes back to the utility; and permission to operate is issued at the end.
**Each of those gates is owned by somebody who is not you and not the customer.** That is the real content of the roadmap here. You are not promising to be fast. You are naming who holds each gate, so that waiting on a utility reads as the process working rather than as you failing.
Do not quote a timeline you have not looked up
This is the part most reps get wrong in the other direction. Having learned that the roadmap matters, they put a number on it — *about ninety days* — from memory, from a different project, or from a different state entirely.
**Interconnection and permitting timelines vary by utility and by jurisdiction, and they move.** A half-remembered figure stops being an estimate the moment you say it out loud; it becomes a promise you did not mean to make, and it comes back at month four with your name on it. The discipline is the same one the manual applies to a deductible or a policy: **look up the real numbers for this specific utility and this specific authority before the meeting, and bring them.** A rep who says *“I don’t know yet, and I will have the actual figure for your utility before we sign”* is worth more than one who guesses confidently.
What to do at the table
- Put the sequence in the roadmap, before the problem step. Eight named gates in ninety seconds, with the owner of each one said out loud.
- Name the quiet months specifically. “Between the agreement and the build there is a stretch where nothing visible happens. That is normal and it is the utility’s clock, not ours.” Said in minute three it is a fact; said at month three it is an excuse.
- Bring the real local numbers, or bring the honest absence of them. Never bring a remembered one.
- Agree what contact looks like during the silence — a date, a channel, who initiates. The absence of news needs an owner too.
- Say which gates can actually fail, and what happens then. A utility study that comes back requiring upgrades is a real outcome; a customer who heard about it at the table can absorb it, and one who did not will treat it as a bait and switch.
- If the gap is genuinely too long for their situation, surface that as a gate in the open rather than discovering it at the paperwork step. Some timelines do not fit some businesses, and that is a qualification problem, not an objection.
Why the long version closes better than the short one
The objection to all of this is obvious: why volunteer a six-month wait to someone who is ready to sign? Because the wait exists whether or not you mention it, and you only control **when** they find out.
Raised at the table, the long timeline produces a question you can answer while you are in the room. Discovered at month three, the same timeline produces a phone call you are not part of — with a partner, a CFO, or somebody selling something faster. **A deal that closes only because the customer misunderstood the schedule is a cancellation with a later date on it**, and the method would rather you lost it in the meeting.
Questions closers ask
- How long does commercial solar take from signature to switch-on?
Long enough that it belongs in the roadmap, and variable enough that no honest rep quotes it from memory. The sequence runs from interconnection application through utility review, agreement, permitting, construction, inspection and as-built paperwork to permission to operate, and the durations depend on the specific utility and authority having jurisdiction. Look up the real figures for the project in front of you.
- Which of the six steps does “how long until it’s running” belong to?
The roadmap — where what happens in and after the meeting is agreed up front. When it arrives as an angry call at month three, the fault was a roadmap that never ran, and the rule is to fix the earliest broken step first.
- Should I tell a commercial customer the timeline could be months?
Yes, in the roadmap, before the problem step. The wait exists whether or not you mention it; the only thing you control is whether they learn about it while you are in the room to answer, or in a conversation you are not part of.
- What if I do not know the interconnection timeline for their utility?
Say so, and commit to a date by which you will have it. An admitted gap costs far less than a remembered number, because a figure said out loud stops being an estimate and becomes a promise. This is the same discipline the manual applies to a deductible or a policy term.
- Why does this hit commercial solar harder than residential?
The gap between yes and on is longer, more of the gates are owned by third parties, and the buyer is usually accountable to somebody else for the decision. A residential customer waiting is impatient; a commercial buyer waiting is explaining the wait to a board.
Run it, don’t just read it
This is one piece of the method. The Court Method is the whole of it: the six steps with the psychology each one runs on, the language card, the asset table for twelve industries, the One Question map, the six-step diagnostic and the Table-Tried scorecard. $27, once. Run it on 10 tables inside 60 days; if you can’t name the step you were losing at, send the scorecards and get every dollar back.
60-day, 10-table guarantee.
The method for your industry
More guides
- Why Buyers Say 'Let Me Think About It' — and Which Step You Lost Them At
- 'I Need to Talk to My Spouse' Is Not an Objection. It's a Minute-Two Mistake.
- 'Just Tell Me the Price': What It Means When It Arrives at Minute Six
- Rapport Isn't Small Talk: How to Open a Sales Meeting So It Doesn't Die
- Six Words That Lose Sales — and What to Say Instead
- The One Question to Ask Every Buyer — and the Five Answers You'll Hear
- The Four Pressures Every Buyer Lives With — and Why Your Problem Slide Isn't Landing
- Why Closing Techniques Fail — and What to Do Instead of Closing
- How to Score a Sales Meeting — and Stop Drilling the Close When the Open Is Broken
- Where the Sales Meeting Dies: Six Tells, Six Causes, One Fix Order
- The One-Legger: Run It, or Reschedule? — The Court Method
- The Kitchen Table Close: Running the Hardest Room in Sales
- Why Signed Deals Cancel — and What the Meeting Did Wrong
- What a Setter Should Hand the Closer — The Court Method
- "Just Leave Me a Quote" — What It Means and What to Do
- Pest Control Sales at the Door: The Number, the Gate, and the Claim You Cannot Make
- The Deductible Objection in Roofing Sales: What “Can You Take Care of It?” Really Means
- “I Already Have an Advisor” — the Gate You Skipped, Not the Objection You Lost
- “Your Commission Is Too High” — What That Sentence Is Really Measuring
- “I Need to Run It by the Board” — an Open-Step Failure, Not a Stall
- The Adjuster Only Approved a Repair — What That Means at the Table
- Selling to a Buyer Who’s Upside Down on Their Trade
- Mobile Detailing Sales: the Recurring Plan, the Gate, and the Number
- ACV vs RCV on a Roof Claim — the Two Checks, and Who Else Has to Say Yes
- “How Do You Get Paid?” — the Question a Regulator Told Them to Ask
- “Will This Raise My Rate?” — the Cost Your Benefits List Left Out